Solution Description
RV sequence Characteristics
- RV – Measurements:030-040-050-063-075-a hundred and five-a hundred and ten-a hundred thirty-a hundred and fifty
- Enter Possibilities: with enter shaft, With Square flange,With Enter Flange
- Input CZPT .06 to 11 kW
- RV-Dimension from 030 to 105 in die-solid aluminium alloy budy and in excess of a hundred and ten in cast iron
- Ratios between 5 and 100
- Max torque 1550 N.m and admissible output radial masses max 8771 N
- Aluminium models are equipped total with artificial oil and enable for CZPT mounting positions, with no need to modify lubricant quantity
- Worm wheel: Copper (KK Cu).
- Loading capacity in accordance with: ISO 9001:2015/GB/T 19001-2016
- Measurement 030 and over are painted with RAL 5571 blue
- Worm gear reducers are CZPT with diffferent mixtures: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
- NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
- Possibilities: torque arm, output flange, viton oil seals, low/substantial temperature oil, filling/drain/breather/amount plug,Small gap
Standard versions can be applied to a vast range of CZPT reduction ratios from 5 to one thousand.
Warranty: One year from day of supply.
WORM GEARBOX | |||||
SNW SERIES | Output CZPT Variety: | ||||
Type | Aged Sort | Output Torque | Output Shaft Dia. | 14rpm-280rpm | |
SNW030 | RV030 | 21N.m | φ14 | Relevant CZPT CZPT : | |
SNW040 | RV040 | 45N.m | φ19 | .06kW-11kW | |
SNW050 | RV050 | 84N.m | φ25 | Input Options1: | |
SNW063 | RV063 | 160N.m | φ25 | With Inline AC CZPT | |
SNW075 | RV075 | 230N.m | φ28 | Input Options2: | |
SNW090 | RV090 | 410N.m | φ35 | With Square flange | |
SNW105 | RV105 | 630N.m | φ42 | Enter Options3: | |
SNW110 | RV110 | 725N.m | φ42 | With Enter Shaft | |
SNW130 | RV130 | 1050N.m | φ45 | Input Options4: | |
SNW150 | RV150 | 1550N.m | φ50 | With Input Flange |
Starshine CZPT
ZheJiang CZPT shine CZPT Co.,Ltd,the predecessor was a point out-owned armed forces mould company, was proven in 1965. CZPT shine specializes in the full CZPT transmission resolution for high-stop gear producing industries dependent on the aim of “System Merchandise, Software Design and style and Professional Support”.
Starshine have a strong technical power with over 350 staff at existing, including more than thirty CZPT specialists, thirty high quality inspectors, masking an spot of 80000 square meters and kinds of CZPT d processing machines and tests equipments. We have a great foundation for the industry application improvement and support of substantial-conclude velocity reducers & variators possessing to the provincial CZPT technology investigation centre,the lab of equipment pace reducers, and the base of present day R&D.
Our Crew
Top quality Management
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
to prevent recurrence.
four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
is a product inspection to determine the qualified products.
Packing
Delivery
AC motors differ from a lot of other types of motors, especially some of the much more acquainted DC (direct existing) motors, by many critical conditions. The most simple of these is the simple fact that an AC motor relies entirely on the alternating recent close to its circuit to make successful mechanical vitality. We are going to examine this unique approach in much more depth in the adhering to sections of this manual.