I. Brief Introduction:
FG6is the new technology of linear blowing machine. Comnpared with conventional blowing device, It has 3 enhancement:
1) Large pace: China 1st blowing equipment whose single mildew speed can get to 1800 BPH.
two) Energy preserving: It has only two lamp containers, at minimum 20000USD can be saved for each calendar year, electrical ammeter is equipped.
3) High Trustworthiness: Device adopts modularized design and style principle, the motion is built-in in 3 sets servo motor.
Primary Parameter | ||||
Model | FG-4(4 cavity) | |||
Capacity | Rely on bottle design | 9600-10000PCS/H | ||
Applicable Preform | Height | <330mm | ||
Neck | 20mm-25mm | |||
Relevant Bottle | Neck | twenty-25mm | ||
Volume | Max. 2Liter | |||
Peak | Max. 328mm | |||
Diameter | Max. 105mm | |||
CZPT intake | Install power | 51kw | ||
Heating oven powder | 46kw | |||
Heating Oven running energy | 26kw | |||
Air usage | Pressure | 6m3/min three.0MPa | ||
Capacity | 6m3/min three.0MPa | |||
Mould Chiller | Stress | four-6Bar | ||
Temperature | 6-13ºC | |||
Flow | 45L/min | |||
Oven Chiller | Strain | four-6Bar | ||
Temperature | six-13ºC | |||
Flow | 26L/min | |||
Machine Dimension | L*W*H | 3900*900*2500mm | ||
Excess weight | 3500kg | |||
Capacity: 5000-5500BPH(based on 1L) | ||||
Max. Quantity: 2 Litter Whole Dimension: Blowing Main equipment: three.six*one.three*two.3m Sorting machine: two*one.5*1.5m/Loader: 3*1*one.5m |
||||
Major electrics | ||||
Pneumatic portion& Cylinder | Valve | German FESTO | ||
CZPT part | PLC | Japan Mitsubishi | ||
Servo Technique | Japan Panasonic | |||
Frequency inverter | Japan Mitsubishi | |||
Working method | Japan Mitsubishi | |||
Contact screen | Japan Mitsubishi | |||
Blowing | Valve | Japan Parker | ||
1-way Valve | German FESTO | |||
Throttle Valve | German FESTO | |||
Minimizing Valve | German DURAY | |||
Note: All the electrical elements adopts CE, UL, CCC accredited worldwide Sophisticated high-tech solution |
II. CZPT Attributes:
one. Servo driving and cam linking motion blowing area:
The exclusive cam linking method integrates mold-opening, mould-locking and bottom mold-evevating in a single motion, equipped with higher pace
servo motor, which drastically shortens the blowing cycle and accelerates the spped.
two. Decrease distance of heating heads,maximize the heating efficiency.
Heater distance in the heating oven is minimized to 38.1mm, compared with the traditional heating oven it can help save a lot more than 30%
consumption.Geared up with the air biking program and redundant heating discharge method it assures continual temperature in the heating zone.
3. Efficient and delicate complete inlet technique,ensure the spped and preform protction.
By rotary and delicate preform loading program, the speed of preform feeding is ensured, meanwhile, the preform neck is well guarded.
4. Modularized design conception, handy for routine maintenance and altering changeovers
The equipment adopts modularized design and style idea to make it convenient and cost-saving for the servicing and altering changeovers.
One particular End Station Companies
one) Stand-by engineers team to offer abroad installation and commissioning provider.
two) one year warranty. For the duration of warranty, we provide free of charge of demand for fixing expense.
three) Lifetime maintenance. After-income office can offer existence extended upkeep services.
Welcome to visit our manufacturing unit, in HangCZPT metropolis, not far from ZheJiang .