R Series Coaxial Shaft Helical Gear Reducer for Machinery Conveyor

R Series Coaxial Shaft Helical Gear Reducer for Machinery Conveyor

R series CZPTcal Geared Motor Qualities

one. Attributes:

one. High efficiency: 92%-ninety seven%

 

2. Compact composition: Modest offset output, two stage and three stage are in the same box.

 

three. High precision: the equipment is made of high-quality alloy steel forging, carbonitriding and hardening treatment, grinding procedure to guarantee high precision and steady operating.

4. High interchangeability: highly modular, serial layout, powerful versatility and interchangeability.

2. CZPT parameters

Ratio three.41-289.74
Input electrical power .twelve-160KW
Output torque 61-23200N.m
Output pace five-415rpm
Mounting kind Foot mounted, flange mounted, foot and flange mounted, one-phase foot mounted, single phase flange mounted, Flange-mounted with prolonged bearing hub
Enter Strategy Flange input(AM), shaft enter(Advert), inline AC motor enter, or AQA servo motor
Brake Launch HF-handbook release(lock in the brake release situation), HR-guide launch(autom-atic braking position)
Thermistor TF(Thermistor defense PTC thermisto)
TH(Thermistor safety Bimetal swotch)
Mounting Placement M1, M2, M3, M4, M5, M6
Sort R17-R167
Output shaft dis. 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm
Housing material HT200 high-toughness forged iron from R37,forty seven,57,sixty seven,77,87
Housing materials HT250 Large power cast iron from R97 107,137,147,157,167,187
Warmth treatment technology carbonitriding and hardening remedy
Efficiency ninety two%-97%
Lubricant VG220
Safety Course IP55, F class

CZPTshine Drive

ZheJiang CZPTshine Travel Co.,Ltd,the predecessor was a condition-owned navy mould business, was established in 1965. CZPTshine specializes in the comprehensive energy transmission resolution for large-end products production industries based mostly on the purpose of “System Product, Software Layout and Professional Support”.
CZPTshine have a strong complex pressure with over 350 staff at current, like in excess of thirty engineering professionals, thirty top quality inspectors, covering an spot of 80000 sq. meters and types of innovative processing devices and tests equipments. We have a very good basis for the business application growth and services of higher-conclude speed reducers & variators possessing to the provincial engineering technological innovation investigation center,the lab of gear speed reducers, and the base of contemporary R&D.

Our Group

High quality Handle
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
merchandise is a product inspection to determine the qualified products.

7. Certification.

Packing

Shipping and delivery

R Series Coaxial Shaft Helical Gear Reducer for Machinery Conveyor